Connecting fuel and electrical.
Generac generator gas line installation.
Ideal for larger homes these standby generators are diesel generators that can also run on natural gas or liquid propane fuel types depending on the model.
Connect gas line to meter.
Generac s protector series is a line of premium home backup generators for residential backup power.
With the generator itself in place a transfer switch will be installed next to your main breaker box in some cases it may replace the breaker box entirely.
Fuel line is connected.
In this video we outline the installation of a 16kw generac air cooled automatic standby generator and a rtsy 200 automatic transfer switch.
A permanently installed generac home backup generator protects your home automatically.
Your generac home backup generator runs on your existing natural gas or lp fuel supply.
Then the fuel line gets installed.
Don t worry about having to be there to start and turn off your generac home backup generator because it does that automatically whether you re home or away.
7 pull electrical cable from generator to house.
On purchases with your generac credit card.
5 dig trench from generator to new high pressure gas meter.
A home backup generator delivers power directly to your home s electrical system backing up your entire home or just the most essential items.
This video is m.
Place generator on the concrete slab gravel.
The closer the site is to a natural gas line and the electric meter the more you will save on installation costs.
Based on msrp and 2 000 installation cost.
It runs on natural gas or liquid propane lp fuel and sits outside just like a central air conditioning unit.
Direct to dirt composite mounting pad complex lattice design prevents settling or sinking of the generator system.
Total payments of.
Save the gas cans for your other outdoor power equipment.
Transfer switch installed next to the main.
3 of 6 installation system 1 ft 305 mm flexible fuel line connector absorbs any generator vibration when connected to rigid pipe.
8 make gas and electrical connection to rear of.
Monthly payments shown are required for 132 months with 9 99 apr promotional financing on your generac credit card for purchases made to.
Wiring is then run in conduit between the generator and the breaker box.
6 run new natural gas line and tracing wire from generator to gas meter.
4 set generator on base.
3 prepare a level stone or concrete base for the generator.
Prepare the site with a concrete slab or pea gravel.